BREWERIES, BREWERY PLANTSDAIRY LINESFILLING LINES FOR BREWERIES AND BEVERAGE INDUSTRYPET BOTTLING PLANTSPET INJECTION PREFORMBLOW MOULDING MACHINERY AND LINESFILLERS AND SCREWERS/CAPPERSBottle inspectorsLabelling machinesSHRINK WRAPPER FOR TRAY, PAD AND FILM, FILM ONLYEDIBLE OIL FILLINGWINE & VODKA FILLINGBOTTLE WASHERS FOR BEER AND BEVERAGE INDUSTRYPASTEURIZERSOTHER EQUIPMENT - INSPECTORS - FILTERS ETC.USED TANKS - CIP - CKT - BBTIf you have any question please feel free to contact us!
 

 

Some Customers

 

LINKS

 USEDBREWERIES

 

 

 

 DAIRY MILK FACTORY


R
eference nr D-22600

DAIRY - MILK FACTORY - capacity 500.000 Liter/day


- The daily production is 500.000 l/day. That means 20 hours production with 25.000 l/h and 4 hours for cleaning and sterilization of the lines.

- The factory produced standardized Milk, Cream with different fat contents, skimmed milk and milk concentrate with different dry contents. These products were used as semi-finished-product for ice cream plant and for other industries. They delivered only full trucks and don’t filled up milk or milk-products for the end-consumer.

- The plant has two pasteurization lines. One for milk (short time heating pasteurization) and one for cream (high heating pasteurization).

- For filling fresh milk in Tetra Pak you need the filling machines. They are not included in the offer; The Milk Factory produced only semi-finished-products.

- To produce UHT-milk you need a UHT-line. This is not included, but we can help you with this.

- This plant is the base for all milk products! When you want to produce Yoghurt, you must have a mix station. The products you can produce with this plant are the base for other products as yoghurt or cheese…
- For example: For yoghurt you need milk which has a higher dry content. This will be made with the concentration line. For producing cheese it’s the same base.

- You can produce 25.000 l/h raw milk. In 8 hours you can produce 200.000 l, but after that you must clean and sterilize the lines. This spends about 3 to 4 hours.

- The filling station of the milk plant has a capacity of 2 x 40.000 l/h. This has the reason that you can quicker get the raw milk into the system and so you have no problems with the centrifuge and pasteurization lines.

- When you install a bigger pasteurizer you can increase the capacity. But the centrifuge has a limited capacity of 25.000 l/h. But everything is possible. The semi-finished products were directly put in storage tanks or filled up in trucks.

- The storage tanks are: 2 x 100.000 l raw milk tanks or process tanks (isolated), 1 x 80.000 l raw milk tank (isolated), 1 x 100.000 l for exhaust vapor (isolated), 1 x 50.000 l cream tank (double jacketed and ice water cooling), 1 x 50.000 l concentrate milk tank (double jacketed and ice water cooling).

- The equipments are complete. Also this factory have a super modern process control system which you can grove up in a very easy and fast way.

- The factory stopped in summer 2009.

We can help you to find the right machines for the products you think about.

 
Location: EUROPE. PLANT IS IN EXCELLENT CONDITIONS!